Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Plan-Apochromat 100x Oil Objective Assembly
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.75 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
21.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.54%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Brass Barrel Spacer Shim Fit
55 < 85/day
Limit: downtime
Brass Barrel Spacer Shim Fit: capacity 55/day vs demand 85/day. Main limit: downtime. Raw C/T 5.7 min, effective C/T 7.3 min.
Quality (RTY)
86.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€725,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
30.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Fluorite Optical Glass
14-Element Micro-Lenses
Weekly · LT 8d
PRODUCTION CONTROL / ERP
ERP
Cleanroom Batch Traveler
CUSTOMER
Bio-Pharma Microscopy
85 units/d
Takt: 5.3 min
EDI / ESD Clean Box
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
153
1.80 d
Drag to reorder step 1
OPTICS LAB
1. Precision Fluori…
×2
Push Flow
C/T
3.8 min
C/O
30 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
85 / 2d
OEE
85.8%
i
Insert a step here
+
I
162
1.91 d
Drag to reorder step 2
VACUUM COATER
2. Multi-Layer Ion-…
×1
Push Flow
C/T
4.5 min
C/O
45 min
Availability
90%
Quality FPY
96.5%
Batch / EPEI
102 / 2d
OEE
79.6%
i
Insert a step here
+
I
179
2.11 d
AUTOMATION
6-DOF Pie…
Drag to reorder step 3
PHOTONICS BAY
3. Brass Barrel Spa…
×2
BOTTLENECK
C/T
5.7 min
C/O
25 min
Availability
84%
Quality FPY
93.8%
Batch / EPEI
43 / 1d
OEE
70.1%
i
Insert a step here
+
I
85
1.00 d
Drag to reorder step 4
SEAL BAY
4. Interferometric …
×2
FIFO Lane
C/T
4.0 min
C/O
15 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
26 / 1d
OEE
83.3%
i
FIFO
Insert a step here
+
I
59
0.69 d
Drag to reorder step 5
METROLOGY
5. Strehl Ratio >0.…
×2
Continuous Flow
C/T
3.2 min
C/O
8 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
17 / 1d
OEE
87.6%
i
Insert a step at the end
+
I
102
1.20 d
Finished Goods
OUT
1.80 d
VA 3.8 min
1.91 d
VA 4.5 min
2.11 d
VA 5.7 min
1.00 d
VA 4.0 min
0.69 d
VA 3.2 min
1.20 d
Total Lead Time
8.75 d
VA Time
21.2 min
PCE
0.54%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step