Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
NbTi Superconducting MRI Magnet Cryo Wire
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.1 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.2 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.76%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Twist Pitch & Heat Treat
10 < 14/day
Limit: downtime
Twist Pitch & Heat Treat: capacity 10/day vs demand 14/day. Main limit: downtime. Raw C/T 1.1 h, effective C/T 1.4 h.
Quality (RTY)
92.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,278,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
8.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
NbTi Billet Suppliers
46%Nb-Ti Multi-Filament…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
ERP
Color/Gauge Campaign Push
CUSTOMER
Hospital MRI Magnet F…
14 batches/d
Takt: 1.1 h
EDI / Drum Flatbed
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
22
1.57 d
Drag to reorder step 1
ROD MILL
1. Multi-Stack Bill…
×2
Continuous Flow
C/T
43.7 min
C/O
35 min
Availability
94%
Quality FPY
99.2%
Batch / EPEI
21 / 2d
OEE
90.8%
i
Insert a step here
+
I
25
1.79 d
Drag to reorder step 2
STRANDER BAY
2. Cold Multi-Pass …
×2
Push Flow
C/T
52.7 min
C/O
50 min
Availability
91%
Quality FPY
98.5%
Batch / EPEI
21 / 2d
OEE
86.3%
i
Insert a step here
+
I
34
2.43 d
SMED
SMED Dual…
Drag to reorder step 3
CCV TOWER
3. Twist Pitch & He…
×3
BOTTLENECK
C/T
1.1 h
C/O
95 min
Availability
83%
Quality FPY
96.4%
Batch / EPEI
28 / 3d
OEE
75.8%
i
Insert a step here
+
I
20
1.43 d
Drag to reorder step 4
ARMOR LINE
4. Polyvinyl-Formal…
×2
Push Flow
C/T
50.2 min
C/O
30 min
Availability
93%
Quality FPY
98.7%
Batch / EPEI
14 / 2d
OEE
88.7%
i
Insert a step here
+
I
13
0.93 d
Drag to reorder step 5
DRUM TEST
5. 4.2K Liquid Heli…
×2
FIFO Lane
C/T
38.6 min
C/O
12 min
Availability
97%
Quality FPY
99.3%
Batch / EPEI
7 / 1d
OEE
93.8%
i
Insert a step at the end
+
I
25
1.79 d
Finished Goods
OUT
1.57 d
VA 43.7 min
1.79 d
VA 52.7 min
2.43 d
VA 1.1 h
1.43 d
VA 50.2 min
0.93 d
VA 38.6 min
1.79 d
Total Lead Time
10.2 d
VA Time
4.2 h
PCE
2.76%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step