Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
40.9 min
Lead Time (LT)
8.68 d
Value-Added
2.7 h
Efficiency (PCE)
2.08%
BottleneckHelium Mass-Spec Leak Test
16 < 22/day
Limit: downtime
Quality (RTY)
90.3%
WIP Capital
€1,271,600
Carbon CO₂
7.8 t CO₂e/year