Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
24kV SF6-Free Gas-Insulated Switchgear Bay
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
40.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.68 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.08%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Helium Mass-Spec Leak Test
16 < 22/day
Limit: downtime
Helium Mass-Spec Leak Test: capacity 16/day vs demand 22/day. Main limit: downtime. Raw C/T 44.2 min, effective C/T 53.6 min.
Quality (RTY)
90.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,271,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
7.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Vacuum Interrupter OE…
SS Gas Tanks & Cu Busba…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
ERP
Custom Project Build Push
CUSTOMER
Substation & Wind Int…
22 units/d
Takt: 40.9 min
EDI / Daily Dedicated
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
37
1.68 d
Drag to reorder step 1
BUSBAR CELL
1. Laser Tight SS T…
×2
Push Flow
C/T
27.8 min
C/O
25 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
22 / 2d
OEE
91.5%
i
Insert a step here
+
I
33
1.50 d
Drag to reorder step 2
MECH BAY
2. Vacuum Bottle & …
×3
Push Flow
C/T
31.9 min
C/O
20 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
13 / 1d
OEE
88.1%
i
Insert a step here
+
I
44
2.00 d
BALANCING
Pre-Cut L…
Drag to reorder step 3
WIRING BAY
3. Helium Mass-Spec…
×5
BOTTLENECK
C/T
44.2 min
C/O
18 min
Availability
86%
Quality FPY
95.8%
Batch / EPEI
9 / 1d
OEE
78.4%
i
Insert a step here
+
I
24
1.09 d
Drag to reorder step 4
AUTOMATION
4. Clean Air 1.4-Ba…
×2
FIFO Lane
C/T
32.7 min
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
6 / 1d
OEE
86.3%
i
FIFO
Insert a step here
+
I
18
0.82 d
Drag to reorder step 5
HV TEST CAGE
5. 125kV BIL Impuls…
×2
FIFO Lane
C/T
26.2 min
C/O
10 min
Availability
96%
Quality FPY
99.0%
Batch / EPEI
4 / 1d
OEE
89.2%
i
Insert a step at the end
+
I
31
1.41 d
Finished Goods
OUT
1.68 d
VA 27.8 min
1.50 d
VA 31.9 min
2.00 d
VA 44.2 min
1.09 d
VA 32.7 min
0.82 d
VA 26.2 min
1.41 d
Total Lead Time
8.68 d
VA Time
2.7 h
PCE
2.08%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step