Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
OSAT Flip-Chip BGA & 2.5D Interposer Pack
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
4.5 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.2 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
18 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Stealth Laser Wafer Dicing
12,726 < 18,000/day
Limit: downtime
Stealth Laser Wafer Dicing: capacity 12,726/day vs demand 18,000/day. Main limit: downtime. Raw C/T 4.9 s, effective C/T 6.2 s.
Quality (RTY)
86.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€4,406,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
72,705.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Build-Up Film Substra…
Thin Wafers & Cu Pillars
2x / week · LT 14d
PRODUCTION CONTROL / ERP
OSAT MES
Photolitho Bottleneck Queue
CUSTOMER
AI Accelerator Chipma…
18,000 units/d
Takt: 4.5 s
EDI / Clean Nitrogen Pack
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
28,800
1.60 d
Drag to reorder step 1
CLEANROOM BAY 1
1. Ultra-Thin Wafer…
×1
FIFO Lane
C/T
3.1 s
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
18000 / 2d
OEE
93.7%
i
FIFO
Insert a step here
+
I
46,800
2.60 d
KANBAN
FOUP Purg…
Drag to reorder step 2
LITHO CLEANROOM
2. Stealth Laser Wa…
×2
BOTTLENECK
C/T
4.9 s
C/O
35 min
Availability
83%
Quality FPY
94.8%
Batch / EPEI
21600 / 2d
OEE
77.0%
i
Insert a step here
+
I
34,200
1.90 d
Drag to reorder step 3
ETCH BAY
3. Thermo-Comp Flip…
×2
Push Flow
C/T
3.8 s
C/O
25 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
14400 / 2d
OEE
85.6%
i
Insert a step here
+
I
27,000
1.50 d
Drag to reorder step 4
METAL CMP
4. Capillary Underf…
×2
Push Flow
C/T
3.5 s
C/O
20 min
Availability
92%
Quality FPY
98.0%
Batch / EPEI
10800 / 1d
OEE
87.9%
i
Insert a step here
+
I
19,800
1.10 d
Drag to reorder step 5
DIE SORT
5. Solder Ball Drop…
×2
FIFO Lane
C/T
2.9 s
C/O
15 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
7200 / 1d
OEE
89.4%
i
Insert a step at the end
+
I
27,000
1.50 d
Finished Goods
OUT
1.60 d
VA 3.1 s
2.60 d
VA 4.9 s
1.90 d
VA 3.8 s
1.50 d
VA 3.5 s
1.10 d
VA 2.9 s
1.50 d
Total Lead Time
10.2 d
VA Time
18 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step