Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
PCI-PTS Secure EMV Payment Terminal PCBA
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
39 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.40 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.04%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
BGA Underfill Dispense & Cure
1,003 < 1,400/day
Limit: downtime
BGA Underfill Dispense & Cure: capacity 1,003/day vs demand 1,400/day. Main limit: downtime. Raw C/T 41 s, effective C/T 51 s.
Quality (RTY)
88.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€497,280
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
109.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Tamper Security Lamin…
Buried Security Wire PC…
3x / week · LT 5d
PRODUCTION CONTROL / ERP
ERP
Feeder Setup Campaign
CUSTOMER
Merchant Payment Acqu…
1,400 boards/d
Takt: 39 s
EDI / Daily ESD
MRP / 3x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
1,680
1.20 d
Drag to reorder step 1
SMT LINE A
1. Fine-Pitch Secur…
×1
Continuous Flow
C/T
22 s
C/O
25 min
Availability
95%
Quality FPY
98.6%
Batch / EPEI
1120 / 1d
OEE
90.4%
i
Insert a step here
+
I
1,960
1.40 d
Drag to reorder step 2
SMT LINE A
2. Tamper Mesh Elas…
×2
Push Flow
C/T
32 s
C/O
35 min
Availability
91%
Quality FPY
97.4%
Batch / EPEI
1120 / 2d
OEE
84.3%
i
Insert a step here
+
I
2,520
1.80 d
SMED
SMED Offl…
Drag to reorder step 3
REFLOW/AOI
3. BGA Underfill Di…
×2
BOTTLENECK
C/T
41 s
C/O
45 min
Availability
84%
Quality FPY
95.4%
Batch / EPEI
1400 / 2d
OEE
76.1%
i
Insert a step here
+
I
1,400
1.00 d
Drag to reorder step 4
BACK-END THT
4. HSM Crypto Key I…
×2
FIFO Lane
C/T
30 s
C/O
18 min
Availability
93%
Quality FPY
98.1%
Batch / EPEI
560 / 1d
OEE
86.7%
i
FIFO
Insert a step here
+
I
1,120
0.80 d
Drag to reorder step 5
BOX BUILD
5. Contactless NFC …
×3
FIFO Lane
C/T
26 s
C/O
15 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
350 / 1d
OEE
87.6%
i
Insert a step at the end
+
I
1,680
1.20 d
Finished Goods
OUT
1.20 d
VA 22 s
1.40 d
VA 32 s
1.80 d
VA 41 s
1.00 d
VA 30 s
0.80 d
VA 26 s
1.20 d
Total Lead Time
7.40 d
VA Time
2.5 min
PCE
0.04%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step