Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Dual-Sided Sintered SiC Half-Bridge Module
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
64 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.2 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.05%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Heavy Al Ribbon Wire Bond
596 < 850/day
Limit: downtime
Heavy Al Ribbon Wire Bond: capacity 596/day vs demand 850/day. Main limit: downtime. Raw C/T 69 s, effective C/T 88 s.
Quality (RTY)
86.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,430,550
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3,433.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
DBC Ceramic Substrate…
Si3N4 AMB Ceramic Subst…
2x / week · LT 14d
PRODUCTION CONTROL / ERP
MES
Photolitho Bottleneck Queue
CUSTOMER
Inverter Final Assemb…
850 modules/d
Takt: 64 s
EDI / Clean Nitrogen Pack
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
1,360
1.60 d
Drag to reorder step 1
CLEANROOM BAY 1
1. Silver Sintering…
×1
FIFO Lane
C/T
44 s
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
850 / 2d
OEE
93.0%
i
FIFO
Insert a step here
+
I
2,210
2.60 d
KANBAN
FOUP Purg…
Drag to reorder step 2
LITHO CLEANROOM
2. Heavy Al Ribbon …
×2
BOTTLENECK
C/T
69 s
C/O
35 min
Availability
83%
Quality FPY
94.8%
Batch / EPEI
1020 / 2d
OEE
76.1%
i
Insert a step here
+
I
1,615
1.90 d
Drag to reorder step 3
ETCH BAY
3. AMB Top-Cool Cop…
×2
Push Flow
C/T
53 s
C/O
25 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
680 / 2d
OEE
84.6%
i
Insert a step here
+
I
1,275
1.50 d
Drag to reorder step 4
METAL CMP
4. Transfer Compres…
×2
Push Flow
C/T
50 s
C/O
20 min
Availability
92%
Quality FPY
98.0%
Batch / EPEI
510 / 1d
OEE
86.8%
i
Insert a step here
+
I
935
1.10 d
Drag to reorder step 5
DIE SORT
5. Surge Vcesat & X…
×2
FIFO Lane
C/T
41 s
C/O
15 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
340 / 1d
OEE
88.1%
i
Insert a step at the end
+
I
1,275
1.50 d
Finished Goods
OUT
1.60 d
VA 44 s
2.60 d
VA 69 s
1.90 d
VA 53 s
1.50 d
VA 50 s
1.10 d
VA 41 s
1.50 d
Total Lead Time
10.2 d
VA Time
4.3 min
PCE
0.05%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step