Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Piezoresistive 316L Hygienic Pressure Transmitter
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
69 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.71 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.06%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Signal Condition HART Board
536 < 780/day
Limit: downtime
Signal Condition HART Board: capacity 536/day vs demand 780/day. Main limit: downtime. Raw C/T 75 s, effective C/T 95 s.
Quality (RTY)
86.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€780,390
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
277.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Silicon Sensor Die Su…
316L Flush Diaphragms
Weekly · LT 8d
PRODUCTION CONTROL / ERP
ERP
Cleanroom Batch Traveler
CUSTOMER
Food & Pharma Process…
780 units/d
Takt: 69 s
EDI / ESD Clean Box
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
1,404
1.80 d
Drag to reorder step 1
OPTICS LAB
1. SS Diaphragm Ele…
×2
Push Flow
C/T
50 s
C/O
30 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
780 / 2d
OEE
88.9%
i
Insert a step here
+
I
1,482
1.90 d
Drag to reorder step 2
VACUUM COATER
2. Oil-Fill Vacuum …
×1
Push Flow
C/T
58 s
C/O
45 min
Availability
90%
Quality FPY
96.5%
Batch / EPEI
936 / 2d
OEE
83.2%
i
Insert a step here
+
I
1,638
2.10 d
AUTOMATION
6-DOF Pie…
Drag to reorder step 3
PHOTONICS BAY
3. Signal Condition…
×2
BOTTLENECK
C/T
75 s
C/O
25 min
Availability
84%
Quality FPY
93.8%
Batch / EPEI
390 / 1d
OEE
74.4%
i
Insert a step here
+
I
780
1.00 d
Drag to reorder step 4
SEAL BAY
4. M12 Connector La…
×2
FIFO Lane
C/T
53 s
C/O
15 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
234 / 1d
OEE
88.3%
i
FIFO
Insert a step here
+
I
546
0.70 d
Drag to reorder step 5
METROLOGY
5. Tri-Temp Full Sp…
×2
Continuous Flow
C/T
42 s
C/O
8 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
156 / 1d
OEE
91.9%
i
Insert a step at the end
+
I
936
1.20 d
Finished Goods
OUT
1.80 d
VA 50 s
1.90 d
VA 58 s
2.10 d
VA 75 s
1.00 d
VA 53 s
0.70 d
VA 42 s
1.20 d
Total Lead Time
8.71 d
VA Time
4.6 min
PCE
0.06%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step