N-Type TOPCon Bifacial Solar Cell Fab Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.9 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.70 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.8 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
PECVD AlOx & SiNx Passiv
29,266 < 42,000/day
Limit: downtime
PECVD AlOx & SiNx Passiv: capacity 29,266/day vs demand 42,000/day. Main limit: downtime. Raw C/T 2.1 s, effective C/T 2.7 s.
Quality (RTY)
86.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€401,940
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
14,913.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Silicon Ingot Supplie…
182mm N-Type Czochralsk…
Weekly · LT 8d
PRODUCTION CONTROL / ERP
Solar Fab MES
Cleanroom Batch Traveler
CUSTOMER
PV Module Assembly Pl…
42,000 units/d
Takt: 1.9 s
EDI / ESD Clean Box
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
75,600
1.80 d
Drag to reorder step 1
OPTICS LAB
1. Alkaline Texture…
×2
Push Flow
C/T
1.4 s
C/O
30 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
42000 / 2d
OEE
89.9%
i
Insert a step here
+
I
79,800
1.90 d
Drag to reorder step 2
VACUUM COATER
2. LPCVD Poly-Si Tu…
×1
Push Flow
C/T
1.6 s
C/O
45 min
Availability
90%
Quality FPY
96.5%
Batch / EPEI
50400 / 2d
OEE
84.4%
i
Insert a step here
+
I
88,200
2.10 d
AUTOMATION
6-DOF Pie…
Drag to reorder step 3
PHOTONICS BAY
3. PECVD AlOx & SiN…
×2
BOTTLENECK
C/T
2.1 s
C/O
25 min
Availability
84%
Quality FPY
93.8%
Batch / EPEI
21000 / 1d
OEE
75.9%
i
Insert a step here
+
I
42,000
1.00 d
Drag to reorder step 4
SEAL BAY
4. Ultrasonic Silve…
×2
FIFO Lane
C/T
1.5 s
C/O
15 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
12600 / 1d
OEE
90.0%
i
FIFO
Insert a step here
+
I
29,400
0.70 d
Drag to reorder step 5
METROLOGY
5. Flash IV Efficie…
×2
Continuous Flow
C/T
1.2 s
C/O
8 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
8400 / 1d
OEE
93.3%
i
Insert a step at the end
+
I
50,400
1.20 d
Finished Goods
OUT
1.80 d
VA 1.4 s
1.90 d
VA 1.6 s
2.10 d
VA 2.1 s
1.00 d
VA 1.5 s
0.70 d
VA 1.2 s
1.20 d
Total Lead Time
8.70 d
VA Time
7.8 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step