Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Mini-SMD 1.6x1.2mm Quartz Crystal Resonator
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.4 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.2 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.3 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Vacuum Gold Electrode Sputter
41,571 < 60,000/day
Limit: downtime
Vacuum Gold Electrode Sputter: capacity 41,571/day vs demand 60,000/day. Main limit: downtime. Raw C/T 1.5 s, effective C/T 1.9 s.
Quality (RTY)
86.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€550,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
242,352.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Quartz Blank Suppliers
Synthetic Z-Cut Quartz …
2x / week · LT 14d
PRODUCTION CONTROL / ERP
ERP
Photolitho Bottleneck Queue
CUSTOMER
5G, Smartphones & GNSS
60,000 units/d
Takt: 1.4 s
EDI / Clean Nitrogen Pack
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
96,000
1.60 d
Drag to reorder step 1
CLEANROOM BAY 1
1. Hydrothermal Waf…
×1
FIFO Lane
C/T
1.2 s
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
60000 / 2d
OEE
93.7%
i
FIFO
Insert a step here
+
I
156,000
2.60 d
KANBAN
FOUP Purg…
Drag to reorder step 2
LITHO CLEANROOM
2. Vacuum Gold Elec…
×2
BOTTLENECK
C/T
1.5 s
C/O
35 min
Availability
83%
Quality FPY
94.8%
Batch / EPEI
72000 / 2d
OEE
77.0%
i
Insert a step here
+
I
114,000
1.90 d
Drag to reorder step 3
ETCH BAY
3. Ceramic Seam-Sea…
×2
Push Flow
C/T
1.2 s
C/O
25 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
48000 / 2d
OEE
85.6%
i
Insert a step here
+
I
90,000
1.50 d
Drag to reorder step 4
METAL CMP
4. Laser Frequency …
×2
Push Flow
C/T
1.2 s
C/O
20 min
Availability
92%
Quality FPY
98.0%
Batch / EPEI
36000 / 1d
OEE
87.9%
i
Insert a step here
+
I
66,000
1.10 d
Drag to reorder step 5
DIE SORT
5. Temp-Curve TCXO …
×2
FIFO Lane
C/T
1.2 s
C/O
15 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
24000 / 1d
OEE
89.4%
i
Insert a step at the end
+
I
90,000
1.50 d
Finished Goods
OUT
1.60 d
VA 1.2 s
2.60 d
VA 1.5 s
1.90 d
VA 1.2 s
1.50 d
VA 1.2 s
1.10 d
VA 1.2 s
1.50 d
Total Lead Time
10.2 d
VA Time
6.3 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step