Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
EUV Phase-Shift Photomask Blank & Write
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.4 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.39%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Chrome/MoSi Dry Etch
20 < 28/day
Limit: downtime
Chrome/MoSi Dry Etch: capacity 20/day vs demand 28/day. Main limit: downtime. Raw C/T 34.7 min, effective C/T 44.1 min.
Quality (RTY)
86.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€4,004,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
113.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Photomask Blank Suppl…
Ultra-Low Expansion Mas…
2x / week · LT 14d
PRODUCTION CONTROL / ERP
Photomask MES
Photolitho Bottleneck Queue
CUSTOMER
Global Foundry Litho …
28 units/d
Takt: 32.1 min
EDI / Clean Nitrogen Pack
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
45
1.61 d
Drag to reorder step 1
CLEANROOM BAY 1
1. 50keV Electron-B…
×1
FIFO Lane
C/T
22.5 min
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
28 / 2d
OEE
93.0%
i
FIFO
Insert a step here
+
I
73
2.61 d
KANBAN
FOUP Purg…
Drag to reorder step 2
LITHO CLEANROOM
2. Chrome/MoSi Dry …
×2
BOTTLENECK
C/T
34.7 min
C/O
35 min
Availability
83%
Quality FPY
94.8%
Batch / EPEI
34 / 2d
OEE
76.2%
i
Insert a step here
+
I
53
1.89 d
Drag to reorder step 3
ETCH BAY
3. Pellicle Frame C…
×2
Push Flow
C/T
27.0 min
C/O
25 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
22 / 2d
OEE
84.6%
i
Insert a step here
+
I
42
1.50 d
Drag to reorder step 4
METAL CMP
4. Actinic DUV Die-…
×2
Push Flow
C/T
25.1 min
C/O
20 min
Availability
92%
Quality FPY
98.0%
Batch / EPEI
17 / 1d
OEE
86.9%
i
Insert a step here
+
I
31
1.11 d
Drag to reorder step 5
DIE SORT
5. FIB Focused-Ion …
×2
FIFO Lane
C/T
20.6 min
C/O
15 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
11 / 1d
OEE
88.1%
i
Insert a step at the end
+
I
42
1.50 d
Finished Goods
OUT
1.61 d
VA 22.5 min
2.61 d
VA 34.7 min
1.89 d
VA 27.0 min
1.50 d
VA 25.1 min
1.11 d
VA 20.6 min
1.50 d
Total Lead Time
10.4 d
VA Time
2.2 h
PCE
1.39%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step