Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
32.1 min
Lead Time (LT)
10.4 d
Value-Added
2.2 h
Efficiency (PCE)
1.39%
BottleneckChrome/MoSi Dry Etch
20 < 28/day
Limit: downtime
Quality (RTY)
86.8%
WIP Capital
€4,004,000
Carbon CO₂
113.1 t CO₂e/year