Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
400G OSFP / QSFP-DD Optical Transceiver
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
45 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.70 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.0 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.03%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
High-Speed RF PCB Wirebond
1,254 < 1,800/day
Limit: downtime
High-Speed RF PCB Wirebond: capacity 1,254/day vs demand 1,800/day. Main limit: downtime. Raw C/T 49 s, effective C/T 62 s.
Quality (RTY)
86.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,897,100
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
639.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Silicon Photonics Waf…
EML Lasers & Mux Micro-…
Weekly · LT 8d
PRODUCTION CONTROL / ERP
MES
Cleanroom Batch Traveler
CUSTOMER
Cloud Switch Builders
1,800 units/d
Takt: 45 s
EDI / ESD Clean Box
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
3,240
1.80 d
Drag to reorder step 1
OPTICS LAB
1. Laser Chip Eutec…
×2
Push Flow
C/T
32 s
C/O
30 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
1800 / 2d
OEE
89.9%
i
Insert a step here
+
I
3,420
1.90 d
Drag to reorder step 2
VACUUM COATER
2. Micro-Lens Activ…
×1
Push Flow
C/T
38 s
C/O
45 min
Availability
90%
Quality FPY
96.5%
Batch / EPEI
2160 / 2d
OEE
84.4%
i
Insert a step here
+
I
3,780
2.10 d
AUTOMATION
6-DOF Pie…
Drag to reorder step 3
PHOTONICS BAY
3. High-Speed RF PC…
×2
BOTTLENECK
C/T
49 s
C/O
25 min
Availability
84%
Quality FPY
93.8%
Batch / EPEI
900 / 1d
OEE
75.9%
i
Insert a step here
+
I
1,800
1.00 d
Drag to reorder step 4
SEAL BAY
4. Die-Cast Latch H…
×2
FIFO Lane
C/T
34 s
C/O
15 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
540 / 1d
OEE
90.0%
i
FIFO
Insert a step here
+
I
1,260
0.70 d
Drag to reorder step 5
METROLOGY
5. BERT Bit-Error-R…
×2
Continuous Flow
C/T
27 s
C/O
8 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
360 / 1d
OEE
93.3%
i
Insert a step at the end
+
I
2,160
1.20 d
Finished Goods
OUT
1.80 d
VA 32 s
1.90 d
VA 38 s
2.10 d
VA 49 s
1.00 d
VA 34 s
0.70 d
VA 27 s
1.20 d
Total Lead Time
8.70 d
VA Time
3.0 min
PCE
0.03%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step