Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
PVT Silicon Carbide Crystal Growth & Wire Saw
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
15.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.2 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.44%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
OD Grind & Flat Orientation
64 < 90/day
Limit: downtime
OD Grind & Flat Orientation: capacity 64/day vs demand 90/day. Main limit: downtime. Raw C/T 16.2 min, effective C/T 20.6 min.
Quality (RTY)
86.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€3,488,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
363.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
High-Purity Si & Grap…
2200°C PVT Furnace Cruc…
2x / week · LT 14d
PRODUCTION CONTROL / ERP
ERP
Photolitho Bottleneck Queue
CUSTOMER
SiC Wafer Epi Fabs
90 batches/d
Takt: 15.0 min
EDI / Clean Nitrogen Pack
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
144
1.60 d
Drag to reorder step 1
CLEANROOM BAY 1
1. 2200°C PVT Seed …
×1
FIFO Lane
C/T
10.5 min
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
90 / 2d
OEE
93.7%
i
FIFO
Insert a step here
+
I
234
2.60 d
KANBAN
FOUP Purg…
Drag to reorder step 2
LITHO CLEANROOM
2. OD Grind & Flat …
×2
BOTTLENECK
C/T
16.2 min
C/O
35 min
Availability
83%
Quality FPY
94.8%
Batch / EPEI
108 / 2d
OEE
77.0%
i
Insert a step here
+
I
171
1.90 d
Drag to reorder step 3
ETCH BAY
3. Diamond Multi-Wi…
×2
Push Flow
C/T
12.6 min
C/O
25 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
72 / 2d
OEE
85.6%
i
Insert a step here
+
I
135
1.50 d
Drag to reorder step 4
METAL CMP
4. Lapping & Laser …
×2
Push Flow
C/T
11.7 min
C/O
20 min
Availability
92%
Quality FPY
98.0%
Batch / EPEI
54 / 1d
OEE
87.9%
i
Insert a step here
+
I
99
1.10 d
Drag to reorder step 5
DIE SORT
5. KOH Defect & Bow…
×2
FIFO Lane
C/T
9.6 min
C/O
15 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
36 / 1d
OEE
89.4%
i
Insert a step at the end
+
I
135
1.50 d
Finished Goods
OUT
1.60 d
VA 10.5 min
2.60 d
VA 16.2 min
1.90 d
VA 12.6 min
1.50 d
VA 11.7 min
1.10 d
VA 9.6 min
1.50 d
Total Lead Time
10.2 d
VA Time
1.0 h
PCE
0.44%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step