Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
24/7 High-Bright 3500-Nit Digital Totem Display
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
13.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.29 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
53.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.81%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Sealed IP65 Heat-Exchanger
46 < 65/day
Limit: downtime
Sealed IP65 Heat-Exchanger: capacity 46/day vs demand 65/day. Main limit: downtime. Raw C/T 14.8 min, effective C/T 18.1 min.
Quality (RTY)
90.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€775,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Open-Cell Display Gla…
Optical Filter & Heat E…
2x / week · LT 7d
PRODUCTION CONTROL / ERP
MES
SKU Firmware Lot Batch
CUSTOMER
Transit & Retail Malls
65 units/d
Takt: 13.8 min
EDI / Daily Air/Truck
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
85
1.31 d
Drag to reorder step 1
PREP CELL
1. Open-Cell Optica…
×2
Push Flow
C/T
8.9 min
C/O
15 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
39 / 1d
OEE
92.3%
i
Insert a step here
+
I
78
1.20 d
Drag to reorder step 2
ASSY U-CELL
2. Multi-Zone Mini-…
×4
FIFO Lane
C/T
11.6 min
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
20 / 1d
OEE
86.8%
i
FIFO
Insert a step here
+
I
104
1.60 d
AUTOMATION
Parallel …
Drag to reorder step 3
TEST STATION
3. Sealed IP65 Heat…
×3
BOTTLENECK
C/T
14.8 min
C/O
15 min
Availability
86%
Quality FPY
95.2%
Batch / EPEI
16 / 1d
OEE
76.3%
i
Insert a step here
+
I
59
0.91 d
Drag to reorder step 4
FINISH LINE
4. Optical Bonding …
×2
FIFO Lane
C/T
10.3 min
C/O
8 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
16 / 1d
OEE
90.5%
i
FIFO
Insert a step here
+
I
46
0.71 d
Drag to reorder step 5
RETAIL PACK
5. 72-Hour Solar Lo…
×3
Continuous Flow
C/T
7.8 min
C/O
6 min
Availability
98%
Quality FPY
99.6%
Batch / EPEI
13 / 1d
OEE
94.4%
i
Insert a step at the end
+
I
98
1.51 d
Finished Goods
OUT
1.31 d
VA 8.9 min
1.20 d
VA 11.6 min
1.60 d
VA 14.8 min
0.91 d
VA 10.3 min
0.71 d
VA 7.8 min
1.51 d
Total Lead Time
7.29 d
VA Time
53.3 min
PCE
0.81%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step