Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Matter Wi-Fi Aluminum Smart HVAC Thermostat
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
25 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.20 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
95 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
24VAC Triac Relay Backplate
1,569 < 2,200/day
Limit: downtime
24VAC Triac Relay Backplate: capacity 1,569/day vs demand 2,200/day. Main limit: downtime. Raw C/T 26 s, effective C/T 32 s.
Quality (RTY)
90.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€728,640
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
155.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Turned Anodized Al Ri…
e-Paper / LCD & VOC Sen…
2x / week · LT 7d
PRODUCTION CONTROL / ERP
ERP
SKU Firmware Lot Batch
CUSTOMER
Utility & Home Instal…
2,200 units/d
Takt: 25 s
EDI / Daily Air/Truck
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
2,860
1.30 d
Drag to reorder step 1
PREP CELL
1. CNC Anodized Dia…
×2
Push Flow
C/T
16 s
C/O
15 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
1320 / 1d
OEE
92.3%
i
Insert a step here
+
I
2,640
1.20 d
Drag to reorder step 2
ASSY U-CELL
2. Temp/Humidity/VO…
×4
FIFO Lane
C/T
21 s
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
660 / 1d
OEE
86.7%
i
FIFO
Insert a step here
+
I
3,520
1.60 d
AUTOMATION
Parallel …
Drag to reorder step 3
TEST STATION
3. 24VAC Triac Rela…
×3
BOTTLENECK
C/T
26 s
C/O
15 min
Availability
86%
Quality FPY
95.2%
Batch / EPEI
550 / 1d
OEE
76.4%
i
Insert a step here
+
I
1,980
0.90 d
Drag to reorder step 4
FINISH LINE
4. Automated RF Pai…
×2
FIFO Lane
C/T
18 s
C/O
8 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
550 / 1d
OEE
90.5%
i
FIFO
Insert a step here
+
I
1,540
0.70 d
Drag to reorder step 5
RETAIL PACK
5. Relay Surge & Gi…
×3
Continuous Flow
C/T
14 s
C/O
6 min
Availability
98%
Quality FPY
99.6%
Batch / EPEI
440 / 1d
OEE
94.4%
i
Insert a step at the end
+
I
3,300
1.50 d
Finished Goods
OUT
1.30 d
VA 16 s
1.20 d
VA 21 s
1.60 d
VA 26 s
0.90 d
VA 18 s
0.70 d
VA 14 s
1.50 d
Total Lead Time
7.20 d
VA Time
95 s
PCE
0.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step