Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Sapphire-Glass ECG Biomedical Smartwatch Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
29 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.20 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
111 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Ti Chassis & Sapphire Press
2,044 < 2,800/day
Limit: downtime
Ti Chassis & Sapphire Press: capacity 2,044/day vs demand 2,800/day. Main limit: downtime. Raw C/T 31 s, effective C/T 38 s.
Quality (RTY)
90.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,895,040
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
198.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Titanium Cases & PPG …
LTPO AMOLED & Optical P…
2x / week · LT 7d
PRODUCTION CONTROL / ERP
MES
SKU Firmware Lot Batch
CUSTOMER
Retail & Health Insur…
2,800 units/d
Takt: 29 s
EDI / Daily Air/Truck
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
3,640
1.30 d
Drag to reorder step 1
PREP CELL
1. Micro-SIP Stacke…
×2
Push Flow
C/T
19 s
C/O
15 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
1680 / 1d
OEE
93.2%
i
Insert a step here
+
I
3,360
1.20 d
Drag to reorder step 2
ASSY U-CELL
2. PPG Optical Resi…
×4
FIFO Lane
C/T
24 s
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
840 / 1d
OEE
88.1%
i
FIFO
Insert a step here
+
I
4,480
1.60 d
AUTOMATION
Parallel …
Drag to reorder step 3
TEST STATION
3. Ti Chassis & Sap…
×3
BOTTLENECK
C/T
31 s
C/O
15 min
Availability
86%
Quality FPY
95.2%
Batch / EPEI
700 / 1d
OEE
78.2%
i
Insert a step here
+
I
2,520
0.90 d
Drag to reorder step 4
FINISH LINE
4. Laser Seal & Ban…
×2
FIFO Lane
C/T
21 s
C/O
8 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
700 / 1d
OEE
91.6%
i
FIFO
Insert a step here
+
I
1,960
0.70 d
Drag to reorder step 5
RETAIL PACK
5. ECG Accuracy & 5…
×3
Continuous Flow
C/T
16 s
C/O
6 min
Availability
98%
Quality FPY
99.6%
Batch / EPEI
560 / 1d
OEE
95.4%
i
Insert a step at the end
+
I
4,200
1.50 d
Finished Goods
OUT
1.30 d
VA 19 s
1.20 d
VA 24 s
1.60 d
VA 31 s
0.90 d
VA 21 s
0.70 d
VA 16 s
1.50 d
Total Lead Time
7.20 d
VA Time
111 s
PCE
0.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step