Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
1500V EN-50618 Cross-Linked Solar Cable
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
11.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.93 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
44.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.33%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
10MeV Electron-Beam Crosslink
87 < 120/day
Limit: downtime
10MeV Electron-Beam Crosslink: capacity 87/day vs demand 120/day. Main limit: downtime. Raw C/T 12.0 min, effective C/T 15.0 min.
Quality (RTY)
92.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€997,920
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
71.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Tinned Electrolytic Cu
Halogen-Free XLPO Polyo…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
ERP
Color/Gauge Campaign Push
CUSTOMER
Utility Solar String …
120 batches/d
Takt: 11.3 min
EDI / Drum Flatbed
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
192
1.60 d
Drag to reorder step 1
ROD MILL
1. Fine-Wire Tinnin…
×2
Continuous Flow
C/T
7.7 min
C/O
35 min
Availability
94%
Quality FPY
99.2%
Batch / EPEI
180 / 2d
OEE
91.6%
i
Insert a step here
+
I
216
1.80 d
Drag to reorder step 2
STRANDER BAY
2. Dual-Layer Color…
×2
Push Flow
C/T
9.2 min
C/O
50 min
Availability
91%
Quality FPY
98.5%
Batch / EPEI
180 / 2d
OEE
87.4%
i
Insert a step here
+
I
288
2.40 d
SMED
SMED Dual…
Drag to reorder step 3
CCV TOWER
3. 10MeV Electron-B…
×3
BOTTLENECK
C/T
12.0 min
C/O
95 min
Availability
83%
Quality FPY
96.4%
Batch / EPEI
240 / 3d
OEE
77.2%
i
Insert a step here
+
I
168
1.40 d
Drag to reorder step 4
ARMOR LINE
4. Spark Test 10kV …
×2
Push Flow
C/T
8.8 min
C/O
30 min
Availability
93%
Quality FPY
98.7%
Batch / EPEI
120 / 2d
OEE
89.8%
i
Insert a step here
+
I
108
0.90 d
Drag to reorder step 5
DRUM TEST
5. UV-Weathering Lo…
×2
FIFO Lane
C/T
6.8 min
C/O
12 min
Availability
97%
Quality FPY
99.3%
Batch / EPEI
60 / 1d
OEE
94.6%
i
Insert a step at the end
+
I
216
1.80 d
Finished Goods
OUT
1.60 d
VA 7.7 min
1.80 d
VA 9.2 min
2.40 d
VA 12.0 min
1.40 d
VA 8.8 min
0.90 d
VA 6.8 min
1.80 d
Total Lead Time
9.93 d
VA Time
44.5 min
PCE
0.33%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step