Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
13.8 min
Lead Time (LT)
8.58 d
Value-Added
55.1 min
Efficiency (PCE)
0.71%
BottleneckDC String MPPT Card Plug
47 < 65/day
Limit: downtime
Quality (RTY)
90.3%
WIP Capital
€1,772,800
Carbon CO₂
23.0 t CO₂e/year