Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
220kV Dynamic Offshore Wind Export Cable
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.9 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.3 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.19%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Lead Alloy Radial Barrier
9 < 12/day
Limit: downtime
Lead Alloy Radial Barrier: capacity 9/day vs demand 12/day. Main limit: downtime. Raw C/T 2.0 h, effective C/T 2.5 h.
Quality (RTY)
92.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€3,360,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
7.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Cu Rod & Galvanized W…
Water-Blocked Copper & …
2x / week · LT 6d
PRODUCTION CONTROL / ERP
MES
Color/Gauge Campaign Push
CUSTOMER
Offshore Wind Develop…
12 batches/d
Takt: 1.9 h
EDI / Drum Flatbed
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
19
1.58 d
Drag to reorder step 1
ROD MILL
1. Sector Copper St…
×2
Continuous Flow
C/T
1.3 h
C/O
35 min
Availability
94%
Quality FPY
99.2%
Batch / EPEI
18 / 2d
OEE
91.6%
i
Insert a step here
+
I
22
1.83 d
Drag to reorder step 2
STRANDER BAY
2. Triple XLPE Extr…
×2
Push Flow
C/T
1.5 h
C/O
50 min
Availability
91%
Quality FPY
98.5%
Batch / EPEI
18 / 2d
OEE
87.4%
i
Insert a step here
+
I
29
2.42 d
SMED
SMED Dual…
Drag to reorder step 3
CCV TOWER
3. Lead Alloy Radia…
×3
BOTTLENECK
C/T
2.0 h
C/O
95 min
Availability
83%
Quality FPY
96.4%
Batch / EPEI
24 / 3d
OEE
77.2%
i
Insert a step here
+
I
17
1.42 d
Drag to reorder step 4
ARMOR LINE
4. Double Helical W…
×2
Push Flow
C/T
1.5 h
C/O
30 min
Availability
93%
Quality FPY
98.7%
Batch / EPEI
12 / 2d
OEE
89.8%
i
Insert a step here
+
I
11
0.92 d
Drag to reorder step 5
DRUM TEST
5. 100-Ton Turntabl…
×2
FIFO Lane
C/T
1.1 h
C/O
12 min
Availability
97%
Quality FPY
99.3%
Batch / EPEI
6 / 1d
OEE
94.6%
i
Insert a step at the end
+
I
22
1.83 d
Finished Goods
OUT
1.58 d
VA 1.3 h
1.83 d
VA 1.5 h
2.42 d
VA 2.0 h
1.42 d
VA 1.5 h
0.92 d
VA 1.1 h
1.83 d
Total Lead Time
10.3 d
VA Time
7.4 h
PCE
3.19%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen