Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
640x512 Uncooled VOx LWIR Thermal Camera Core
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.71 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
11.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.14%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
VOx Wafer Sensor PCB Reflow
221 < 320/day
Limit: downtime
VOx Wafer Sensor PCB Reflow: capacity 221/day vs demand 320/day. Main limit: downtime. Raw C/T 3.0 min, effective C/T 3.8 min.
Quality (RTY)
86.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,280,640
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
113.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Microbolometer Sensor…
Germanium Lenses & VOx …
Weekly · LT 8d
PRODUCTION CONTROL / ERP
ERP
Cleanroom Batch Traveler
CUSTOMER
Industrial & Defense …
320 units/d
Takt: 2.8 min
EDI / ESD Clean Box
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
576
1.80 d
Drag to reorder step 1
OPTICS LAB
1. Diamond-Turn Ge …
×2
Push Flow
C/T
2.0 min
C/O
30 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
320 / 2d
OEE
88.9%
i
Insert a step here
+
I
608
1.90 d
Drag to reorder step 2
VACUUM COATER
2. DLC Hard-Carbon …
×1
Push Flow
C/T
2.4 min
C/O
45 min
Availability
90%
Quality FPY
96.5%
Batch / EPEI
384 / 2d
OEE
83.2%
i
Insert a step here
+
I
672
2.10 d
AUTOMATION
6-DOF Pie…
Drag to reorder step 3
PHOTONICS BAY
3. VOx Wafer Sensor…
×2
BOTTLENECK
C/T
3.0 min
C/O
25 min
Availability
84%
Quality FPY
93.8%
Batch / EPEI
160 / 1d
OEE
74.4%
i
Insert a step here
+
I
320
1.00 d
Drag to reorder step 4
SEAL BAY
4. Dry Shutter Acti…
×2
FIFO Lane
C/T
2.1 min
C/O
15 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
96 / 1d
OEE
88.3%
i
FIFO
Insert a step here
+
I
224
0.70 d
Drag to reorder step 5
METROLOGY
5. NETD <35mK Black…
×2
Continuous Flow
C/T
101 s
C/O
8 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
64 / 1d
OEE
91.9%
i
Insert a step at the end
+
I
384
1.20 d
Finished Goods
OUT
1.80 d
VA 2.0 min
1.90 d
VA 2.4 min
2.10 d
VA 3.0 min
1.00 d
VA 2.1 min
0.70 d
VA 101 s
1.20 d
Total Lead Time
8.71 d
VA Time
11.3 min
PCE
0.14%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step