Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
49 s
Lead Time (LT)
7.20 d
Value-Added
3.2 min
Efficiency (PCE)
0.05%
BottleneckThermal Head Spring Load
779 < 1,100/day
Limit: downtime
Quality (RTY)
90.4%
WIP Capital
€570,240
Carbon CO₂
77.8 t CO₂e/year