Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
128-Element Phased-Array Ultrasound Probe
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
8.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.74 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
32.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.42%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
128-Ch Micro-Coax Solder
76 < 110/day
Limit: downtime
128-Ch Micro-Coax Solder: capacity 76/day vs demand 110/day. Main limit: downtime. Raw C/T 8.8 min, effective C/T 11.2 min.
Quality (RTY)
86.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€784,740
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
39.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Piezo Ceramic Supplie…
PZT-5H Blocks & Micro-C…
Weekly · LT 8d
PRODUCTION CONTROL / ERP
Medical ERP
Cleanroom Batch Traveler
CUSTOMER
Hospital Ultrasound S…
110 units/d
Takt: 8.2 min
EDI / ESD Clean Box
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
198
1.80 d
Drag to reorder step 1
OPTICS LAB
1. PZT Kerf Diamond…
×2
Push Flow
C/T
5.9 min
C/O
30 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
110 / 2d
OEE
88.9%
i
Insert a step here
+
I
209
1.90 d
Drag to reorder step 2
VACUUM COATER
2. Quarter-Wave Aco…
×1
Push Flow
C/T
6.9 min
C/O
45 min
Availability
90%
Quality FPY
96.5%
Batch / EPEI
132 / 2d
OEE
83.2%
i
Insert a step here
+
I
231
2.10 d
AUTOMATION
6-DOF Pie…
Drag to reorder step 3
PHOTONICS BAY
3. 128-Ch Micro-Coa…
×2
BOTTLENECK
C/T
8.8 min
C/O
25 min
Availability
84%
Quality FPY
93.8%
Batch / EPEI
55 / 1d
OEE
74.4%
i
Insert a step here
+
I
110
1.00 d
Drag to reorder step 4
SEAL BAY
4. RTV Silicone Len…
×2
FIFO Lane
C/T
6.2 min
C/O
15 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
33 / 1d
OEE
88.3%
i
FIFO
Insert a step here
+
I
77
0.70 d
Drag to reorder step 5
METROLOGY
5. Pulse-Echo Sensi…
×2
Continuous Flow
C/T
4.9 min
C/O
8 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
22 / 1d
OEE
91.9%
i
Insert a step at the end
+
I
132
1.20 d
Finished Goods
OUT
1.80 d
VA 5.9 min
1.90 d
VA 6.9 min
2.10 d
VA 8.8 min
1.00 d
VA 6.2 min
0.70 d
VA 4.9 min
1.20 d
Total Lead Time
8.74 d
VA Time
32.7 min
PCE
0.42%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step