Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Biomethane RNG Anaerobic Digester & Membrane
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
28.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.79 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.8 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
H2S Carbon Scrub & Drying
33 < 48/day
Limit: downtime
H2S Carbon Scrub & Drying: capacity 33/day vs demand 48/day. Main limit: downtime. Raw C/T 30.1 min, effective C/T 38.5 min.
Quality (RTY)
84.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€362,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
58.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Dairy Manure & Food O…
Organic Silage & Slurry…
Weekly · LT 9d
PRODUCTION CONTROL / ERP
BioGas SCADA
Milestone Batch Release
CUSTOMER
National Gas Pipeline…
48 batches/d
Takt: 28.1 min
EDI / Daily Low-Loader
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
77
1.60 d
Drag to reorder step 1
YARD STAGING
1. Macerator & Past…
×3
Push Flow
C/T
18.3 min
C/O
20 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
48 / 2d
OEE
91.2%
i
Insert a step here
+
I
72
1.50 d
Drag to reorder step 2
ELECTRICAL FIELD
2. 38°C Mesophilic …
×4
Push Flow
C/T
22.5 min
C/O
25 min
Availability
91%
Quality FPY
96.4%
Batch / EPEI
38 / 2d
OEE
85.7%
i
Insert a step here
+
I
106
2.21 d
QUALITY
Factory H…
Drag to reorder step 3
HV TESTING
3. H2S Carbon Scrub…
×3
BOTTLENECK
C/T
30.1 min
C/O
45 min
Availability
85%
Quality FPY
92.0%
Batch / EPEI
29 / 2d
OEE
73.9%
i
Insert a step here
+
I
48
1.00 d
Drag to reorder step 4
GRID COMPLIANCE
4. Hollow-Fiber CO2…
×2
FIFO Lane
C/T
20.8 min
C/O
15 min
Availability
95%
Quality FPY
97.5%
Batch / EPEI
19 / 1d
OEE
90.0%
i
FIFO
Insert a step here
+
I
29
0.60 d
Drag to reorder step 5
GRID SIGN-OFF
5. Odorant Dose & G…
×2
Continuous Flow
C/T
14.6 min
C/O
8 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
10 / 1d
OEE
93.4%
i
Insert a step at the end
+
I
38
0.79 d
Finished Goods
OUT
1.60 d
VA 18.3 min
1.50 d
VA 22.5 min
2.21 d
VA 30.1 min
1.00 d
VA 20.8 min
0.60 d
VA 14.6 min
0.79 d
Total Lead Time
7.79 d
VA Time
1.8 h
PCE
1.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step