Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Dual-Pillar Cantilever Commercial EV Solar Carport
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
28.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.99 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.8 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.96%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Translucent Bifacial Glass Seal
10 < 16/day
Limit: changeovers
Translucent Bifacial Glass Seal: capacity 10/day vs demand 16/day. Main limit: changeovers. Raw C/T 30.1 min, effective C/T 38.5 min.
Quality (RTY)
84.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€483,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
19.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Hot-Dip Galv Steel & …
22kW EV Chargers & Tran…
Weekly · LT 9d
PRODUCTION CONTROL / ERP
CarportERP
Milestone Batch Release
CUSTOMER
Supermarket & Office …
16 skids/d
Takt: 28.1 min
EDI / Daily Low-Loader
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
26
1.63 d
Drag to reorder step 1
YARD STAGING
1. Helical Pile / C…
×3
Push Flow
C/T
18.3 min
C/O
20 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
16 / 2d
OEE
88.5%
i
Insert a step here
+
I
24
1.50 d
Drag to reorder step 2
ELECTRICAL FIELD
2. Cantilever Steel…
×4
Push Flow
C/T
22.5 min
C/O
25 min
Availability
91%
Quality FPY
96.4%
Batch / EPEI
13 / 2d
OEE
81.7%
i
Insert a step here
+
I
35
2.19 d
QUALITY
Factory H…
Drag to reorder step 3
HV TESTING
3. Translucent Bifa…
×3
BOTTLENECK
C/T
30.1 min
C/O
45 min
Availability
85%
Quality FPY
92.0%
Batch / EPEI
10 / 2d
OEE
65.7%
i
Insert a step here
+
I
16
1.00 d
Drag to reorder step 4
GRID COMPLIANCE
4. Under-Deck Condu…
×2
FIFO Lane
C/T
20.8 min
C/O
15 min
Availability
95%
Quality FPY
97.5%
Batch / EPEI
6 / 1d
OEE
84.4%
i
FIFO
Insert a step here
+
I
10
0.63 d
Drag to reorder step 5
GRID SIGN-OFF
5. Dynamic Solar-EV…
×2
Continuous Flow
C/T
14.6 min
C/O
8 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
3 / 1d
OEE
87.0%
i
Insert a step at the end
+
I
13
0.81 d
Finished Goods
OUT
1.63 d
VA 18.3 min
1.50 d
VA 22.5 min
2.19 d
VA 30.1 min
1.00 d
VA 20.8 min
0.63 d
VA 14.6 min
0.81 d
Total Lead Time
7.99 d
VA Time
1.8 h
PCE
2.96%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step