Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
HDPE Modular Floating Solar Reservoir Array
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
10.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
37.8 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.08%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
PV Panel Lock & Connector String
27 < 45/day
Limit: changeovers
PV Panel Lock & Connector String: capacity 27/day vs demand 45/day. Main limit: changeovers. Raw C/T 10.7 min, effective C/T 13.7 min.
Quality (RTY)
84.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€572,550
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
54.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Blow-Molded UV-HDPE F…
Marine Al Hardware & Bi…
Weekly · LT 9d
PRODUCTION CONTROL / ERP
FloatPV ERP
Milestone Batch Release
CUSTOMER
Water Reservoir Utili…
45 skids/d
Takt: 10.0 min
EDI / Daily Low-Loader
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
72
1.60 d
Drag to reorder step 1
YARD STAGING
1. Shoreline Pontoo…
×3
Push Flow
C/T
6.5 min
C/O
20 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
45 / 2d
OEE
88.5%
i
Insert a step here
+
I
68
1.51 d
Drag to reorder step 2
ELECTRICAL FIELD
2. Walkway & Buoy C…
×4
Push Flow
C/T
8.0 min
C/O
25 min
Availability
91%
Quality FPY
96.4%
Batch / EPEI
36 / 2d
OEE
81.6%
i
Insert a step here
+
I
99
2.20 d
QUALITY
Factory H…
Drag to reorder step 3
HV TESTING
3. PV Panel Lock & …
×3
BOTTLENECK
C/T
10.7 min
C/O
45 min
Availability
85%
Quality FPY
92.0%
Batch / EPEI
27 / 2d
OEE
65.2%
i
Insert a step here
+
I
45
1.00 d
Drag to reorder step 4
GRID COMPLIANCE
4. Barge Tow & Elas…
×2
FIFO Lane
C/T
7.4 min
C/O
15 min
Availability
95%
Quality FPY
97.5%
Batch / EPEI
18 / 1d
OEE
84.9%
i
FIFO
Insert a step here
+
I
27
0.60 d
Drag to reorder step 5
GRID SIGN-OFF
5. Floating Inverte…
×2
Continuous Flow
C/T
5.2 min
C/O
8 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
9 / 1d
OEE
87.6%
i
Insert a step at the end
+
I
36
0.80 d
Finished Goods
OUT
1.60 d
VA 6.5 min
1.51 d
VA 8.0 min
2.20 d
VA 10.7 min
1.00 d
VA 7.4 min
0.60 d
VA 5.2 min
0.80 d
Total Lead Time
7.80 d
VA Time
37.8 min
PCE
1.08%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step