Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.3 h
Lead Time (LT)
7.93 d
Value-Added
4.7 h
Efficiency (PCE)
2.65%
BottleneckAxial Supersonic ORC Turbine
12 < 18/day
Limit: downtime
Quality (RTY)
84.4%
WIP Capital
€257,150
Carbon CO₂
21.9 t CO₂e/year