Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
20MW PEM Green Hydrogen Electrolyzer Container
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.8 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.45 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
14.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
11.19%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Gas-Water Separator & Dryer
3 < 4/day
Limit: downtime
Gas-Water Separator & Dryer: capacity 3/day vs demand 4/day. Main limit: downtime. Raw C/T 4.0 h, effective C/T 5.1 h.
Quality (RTY)
84.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,260,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
PEM Stacks & Titanium…
Ir/Pt Membrane Stacks &…
Weekly · LT 9d
PRODUCTION CONTROL / ERP
HydroMES
Milestone Batch Release
CUSTOMER
Steel & Ammonia Offta…
4 skids/d
Takt: 3.8 h
EDI / Daily Low-Loader
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
6
1.50 d
Drag to reorder step 1
YARD STAGING
1. Skid Frame & DI …
×3
Push Flow
C/T
2.4 h
C/O
20 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
4 / 2d
OEE
90.5%
i
Insert a step here
+
I
6
1.50 d
Drag to reorder step 2
ELECTRICAL FIELD
2. PEM Cell-Stack C…
×4
Push Flow
C/T
3.0 h
C/O
25 min
Availability
91%
Quality FPY
96.4%
Batch / EPEI
3 / 2d
OEE
84.5%
i
Insert a step here
+
I
9
2.25 d
QUALITY
Factory H…
Drag to reorder step 3
HV TESTING
3. Gas-Water Separa…
×3
BOTTLENECK
C/T
4.0 h
C/O
45 min
Availability
85%
Quality FPY
92.0%
Batch / EPEI
2 / 2d
OEE
70.4%
i
Insert a step here
+
I
4
1.00 d
Drag to reorder step 4
GRID COMPLIANCE
4. ATEX Leak & Rect…
×2
FIFO Lane
C/T
2.8 h
C/O
15 min
Availability
95%
Quality FPY
97.5%
Batch / EPEI
2 / 1d
OEE
89.5%
i
FIFO
Insert a step here
+
I
2
0.50 d
Drag to reorder step 5
GRID SIGN-OFF
5. High-Purity H2 C…
×2
Continuous Flow
C/T
2.0 h
C/O
8 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
95.3%
i
Insert a step at the end
+
I
3
0.75 d
Finished Goods
OUT
1.50 d
VA 2.4 h
1.50 d
VA 3.0 h
2.25 d
VA 4.0 h
1.00 d
VA 2.8 h
0.50 d
VA 2.0 h
0.75 d
Total Lead Time
8.45 d
VA Time
14.2 h
PCE
11.19%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step