Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
7.5 h
Lead Time (LT)
9.39 d
Value-Added
28.4 h
Efficiency (PCE)
20.13%
BottleneckCooling Heat-Exchanger & Crane
1 < 2/day
Limit: downtime
Quality (RTY)
84.4%
WIP Capital
€1,320,000
Carbon CO₂
2.4 t CO₂e/year