Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.9 h
Lead Time (LT)
8.22 d
Value-Added
7.1 h
Efficiency (PCE)
5.75%
Bottleneck12-Rack LFP Module Slide-In
5 < 8/day
Limit: downtime
Quality (RTY)
84.4%
WIP Capital
€2,108,000
Carbon CO₂
9.7 t CO₂e/year