Offshore Rope-Access Wind Blade Leading-Edge Fix
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
37.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.98 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.95%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Moisture Dry & Filler Putty
7 < 12/day
Limit: changeovers
Moisture Dry & Filler Putty: capacity 7/day vs demand 12/day. Main limit: changeovers. Raw C/T 40.1 min, effective C/T 51.3 min.
Quality (RTY)
84.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€331,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
14.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Wind Leading-Edge Tap…
Epoxy Resin & Heated Bl…
Weekly · LT 9d
PRODUCTION CONTROL / ERP
WindMaint ERP
Milestone Batch Release
CUSTOMER
Wind Farm O&M Operato…
12 parts/d
Takt: 37.5 min
EDI / Daily Low-Loader
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
19
1.58 d
Drag to reorder step 1
YARD STAGING
1. Drone HD Tip Ero…
×3
Push Flow
C/T
24.4 min
C/O
20 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
12 / 2d
OEE
88.5%
i
Insert a step here
+
I
18
1.50 d
Drag to reorder step 2
ELECTRICAL FIELD
2. Rope Rig & Sandi…
×4
Push Flow
C/T
30.0 min
C/O
25 min
Availability
91%
Quality FPY
96.4%
Batch / EPEI
10 / 2d
OEE
81.9%
i
Insert a step here
+
I
26
2.17 d
QUALITY
Factory H…
Drag to reorder step 3
HV TESTING
3. Moisture Dry & F…
×3
BOTTLENECK
C/T
40.1 min
C/O
45 min
Availability
85%
Quality FPY
92.0%
Batch / EPEI
7 / 2d
OEE
64.8%
i
Insert a step here
+
I
12
1.00 d
Drag to reorder step 4
GRID COMPLIANCE
4. Infrared Blanket…
×2
FIFO Lane
C/T
27.8 min
C/O
15 min
Availability
95%
Quality FPY
97.5%
Batch / EPEI
5 / 1d
OEE
85.2%
i
FIFO
Insert a step here
+
I
7
0.58 d
Drag to reorder step 5
GRID SIGN-OFF
5. LEP Tape & Ultra…
×2
Continuous Flow
C/T
19.5 min
C/O
8 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
85.9%
i
Insert a step at the end
+
I
10
0.83 d
Finished Goods
OUT
1.58 d
VA 24.4 min
1.50 d
VA 30.0 min
2.17 d
VA 40.1 min
1.00 d
VA 27.8 min
0.58 d
VA 19.5 min
0.83 d
Total Lead Time
7.98 d
VA Time
2.4 h
PCE
3.95%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step