Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
6.1 min
Lead Time (LT)
7.82 d
Value-Added
23.6 min
Efficiency (PCE)
0.22%
BottleneckArgon-Cl2 Rotary Flux Degas
161 < 220/day
Limit: downtime
Quality (RTY)
89.8%
WIP Capital
€2,488,200
Carbon CO₂
506.4 t CO₂e/year