Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
9.6 min
Lead Time (LT)
7.83 d
Value-Added
37.1 min
Efficiency (PCE)
0.35%
Bottleneck120°C Stripper Reboiler Desorb
102 < 140/day
Limit: downtime
Quality (RTY)
89.8%
WIP Capital
€458,640
Carbon CO₂
322.2 t CO₂e/year