Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Continuous Biomass Pyrolysis Biochar Carbon Sink
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
35.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.92 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.28%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Syngas Flare / CHP Steam Loop
28 < 38/day
Limit: downtime
Syngas Flare / CHP Steam Loop: capacity 28/day vs demand 38/day. Main limit: downtime. Raw C/T 38.0 min, effective C/T 47.2 min.
Quality (RTY)
89.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€184,140
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
87.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Forestry Slash & Nut …
Dry Woodchips <15% Mois…
Continuous Renewable · LT 2d
PRODUCTION CONTROL / ERP
BiocharMRV
High-Energy Peak Curtailment
CUSTOMER
Carbon Credit & Soil …
38 tonnes/d
Takt: 35.5 min
EDI / Certified Lots
MRP / Continuous Renewable
★ PACEMAKER
IN
Insert a step at the start
+
I
53
1.39 d
Drag to reorder step 1
INTAKE MODULE
1. Waste-Heat Chip …
×2
Continuous Flow
C/T
24.2 min
C/O
20 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
38 / 2d
OEE
90.9%
i
Insert a step here
+
I
61
1.61 d
Drag to reorder step 2
CLEAN REACTOR
2. 650°C Oxygen-Fre…
×2
Push Flow
C/T
29.9 min
C/O
30 min
Availability
91%
Quality FPY
97.4%
Batch / EPEI
38 / 2d
OEE
86.7%
i
Insert a step here
+
I
76
2.00 d
GREEN
Renewable…
Drag to reorder step 3
CORE UNIT
3. Syngas Flare / C…
×2
BOTTLENECK
C/T
38.0 min
C/O
40 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
38 / 2d
OEE
78.1%
i
Insert a step here
+
I
34
0.89 d
Drag to reorder step 4
PURITY LAB
4. Water Quench & D…
×2
FIFO Lane
C/T
25.6 min
C/O
10 min
Availability
96%
Quality FPY
98.6%
Batch / EPEI
15 / 1d
OEE
92.9%
i
FIFO
Insert a step here
+
I
27
0.71 d
Drag to reorder step 5
REGISTRY OUT
5. H/Corg Ratio Lab…
×1
Continuous Flow
C/T
19.2 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
11 / 1d
OEE
94.4%
i
Insert a step at the end
+
I
46
1.21 d
Finished Goods
OUT
1.39 d
VA 24.2 min
1.61 d
VA 29.9 min
2.00 d
VA 38.0 min
0.89 d
VA 25.6 min
0.71 d
VA 19.2 min
1.21 d
Total Lead Time
7.92 d
VA Time
2.3 h
PCE
1.28%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step