Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Direct Air Capture (DAC) Solid-Sorbent CO2 Pod
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.05 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.8 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.66%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
100°C Steam Thermal Desorb
13 < 18/day
Limit: downtime
100°C Steam Thermal Desorb: capacity 13/day vs demand 18/day. Main limit: downtime. Raw C/T 1.3 h, effective C/T 1.7 h.
Quality (RTY)
89.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€338,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
41.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Geothermal Heat & Amb…
Amine-Functionalized Fi…
Continuous Renewable · LT 2d
PRODUCTION CONTROL / ERP
DAC Operations ERP
High-Energy Peak Curtailment
CUSTOMER
Subsurface Basalt Seq…
18 batches/d
Takt: 1.3 h
EDI / Certified Lots
MRP / Continuous Renewable
★ PACEMAKER
IN
Insert a step at the start
+
I
25
1.39 d
Drag to reorder step 1
INTAKE MODULE
1. High-Flow Fan CO…
×2
Continuous Flow
C/T
51.0 min
C/O
20 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
18 / 2d
OEE
90.9%
i
Insert a step here
+
I
29
1.61 d
Drag to reorder step 2
CLEAN REACTOR
2. Chamber Vacuum S…
×2
Push Flow
C/T
1.1 h
C/O
30 min
Availability
91%
Quality FPY
97.4%
Batch / EPEI
18 / 2d
OEE
86.7%
i
Insert a step here
+
I
36
2.00 d
GREEN
Renewable…
Drag to reorder step 3
CORE UNIT
3. 100°C Steam Ther…
×2
BOTTLENECK
C/T
1.3 h
C/O
40 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
18 / 2d
OEE
78.1%
i
Insert a step here
+
I
16
0.89 d
Drag to reorder step 4
PURITY LAB
4. CO2 Condense & W…
×2
FIFO Lane
C/T
54.0 min
C/O
10 min
Availability
96%
Quality FPY
98.6%
Batch / EPEI
7 / 1d
OEE
92.9%
i
FIFO
Insert a step here
+
I
13
0.72 d
Drag to reorder step 5
REGISTRY OUT
5. 150-Bar Supercri…
×1
Continuous Flow
C/T
40.5 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
5 / 1d
OEE
94.4%
i
Insert a step at the end
+
I
22
1.22 d
Finished Goods
OUT
1.39 d
VA 51.0 min
1.61 d
VA 1.1 h
2.00 d
VA 1.3 h
0.89 d
VA 54.0 min
0.72 d
VA 40.5 min
1.22 d
Total Lead Time
8.05 d
VA Time
4.8 h
PCE
2.66%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step