Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
100% Hydrogen Direct-Reduced Iron (H2-DRI) EAF
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.81 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
8.0 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.08%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Argon Ladle Secondary Refine
476 < 650/day
Limit: downtime
Argon Ladle Secondary Refine: capacity 476/day vs demand 650/day. Main limit: downtime. Raw C/T 2.2 min, effective C/T 2.8 min.
Quality (RTY)
89.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,940,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,496.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
DR-Grade Pellets & Gr…
67% Fe Pellets & Electr…
Continuous Renewable · LT 2d
PRODUCTION CONTROL / ERP
GreenSteel MES
High-Energy Peak Curtailment
CUSTOMER
Automotive Low-CO2 Co…
650 tonnes/d
Takt: 2.1 min
EDI / Certified Lots
MRP / Continuous Renewable
★ PACEMAKER
IN
Insert a step at the start
+
I
910
1.40 d
Drag to reorder step 1
INTAKE MODULE
1. 100% H2 Shaft Fu…
×2
Continuous Flow
C/T
85 s
C/O
20 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
650 / 2d
OEE
90.9%
i
Insert a step here
+
I
1,040
1.60 d
Drag to reorder step 2
CLEAN REACTOR
2. Hot-Charged EAF …
×2
Push Flow
C/T
105 s
C/O
30 min
Availability
91%
Quality FPY
97.4%
Batch / EPEI
650 / 2d
OEE
86.7%
i
Insert a step here
+
I
1,300
2.00 d
GREEN
Renewable…
Drag to reorder step 3
CORE UNIT
3. Argon Ladle Seco…
×2
BOTTLENECK
C/T
2.2 min
C/O
40 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
650 / 2d
OEE
78.1%
i
Insert a step here
+
I
585
0.90 d
Drag to reorder step 4
PURITY LAB
4. Thin-Slab Contin…
×2
FIFO Lane
C/T
90 s
C/O
10 min
Availability
96%
Quality FPY
98.6%
Batch / EPEI
260 / 1d
OEE
92.9%
i
FIFO
Insert a step here
+
I
455
0.70 d
Drag to reorder step 5
REGISTRY OUT
5. EPD Verified Low…
×1
Continuous Flow
C/T
67 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
195 / 1d
OEE
94.5%
i
Insert a step at the end
+
I
780
1.20 d
Finished Goods
OUT
1.40 d
VA 85 s
1.60 d
VA 105 s
2.00 d
VA 2.2 min
0.90 d
VA 90 s
0.70 d
VA 67 s
1.20 d
Total Lead Time
7.81 d
VA Time
8.0 min
PCE
0.08%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step