Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.3 h
Lead Time (LT)
8.31 d
Value-Added
4.8 h
Efficiency (PCE)
7.72%
BottleneckFlash Tank Steam Separator
4 < 6/day
Limit: downtime
Quality (RTY)
89.8%
WIP Capital
€851,000
Carbon CO₂
13.8 t CO₂e/year