Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
8.4 min
Lead Time (LT)
7.82 d
Value-Added
32.5 min
Efficiency (PCE)
0.31%
BottleneckSelective Isomerization Crack
117 < 160/day
Limit: downtime
Quality (RTY)
89.8%
WIP Capital
€2,308,800
Carbon CO₂
368.3 t CO₂e/year