Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
End-of-Life Solar PV Glass, Silver & Si Recovery
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.89 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Mechanical Glass Separation
34 < 48/day
Limit: downtime
Mechanical Glass Separation: capacity 34/day vs demand 48/day. Main limit: downtime. Raw C/T 20.1 min, effective C/T 24.9 min.
Quality (RTY)
89.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€157,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
110.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Repowered Utility Sol…
Decommissioned Glass PV…
Continuous Renewable · LT 2d
PRODUCTION CONTROL / ERP
PVRecycle ERP
High-Energy Peak Curtailment
CUSTOMER
Glass & Silver Refine…
48 tonnes/d
Takt: 18.8 min
EDI / Certified Lots
MRP / Continuous Renewable
★ PACEMAKER
IN
Insert a step at the start
+
I
67
1.40 d
Drag to reorder step 1
INTAKE MODULE
1. Al Frame & Junct…
×2
Continuous Flow
C/T
12.8 min
C/O
20 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
48 / 2d
OEE
90.3%
i
Insert a step here
+
I
77
1.60 d
Drag to reorder step 2
CLEAN REACTOR
2. Hot-Knife EVA Th…
×2
Push Flow
C/T
15.8 min
C/O
30 min
Availability
91%
Quality FPY
97.4%
Batch / EPEI
48 / 2d
OEE
85.7%
i
Insert a step here
+
I
96
2.00 d
GREEN
Renewable…
Drag to reorder step 3
CORE UNIT
3. Mechanical Glass…
×2
BOTTLENECK
C/T
20.1 min
C/O
40 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
48 / 2d
OEE
76.9%
i
Insert a step here
+
I
43
0.90 d
Drag to reorder step 4
PURITY LAB
4. Hydro-Acid Silve…
×2
FIFO Lane
C/T
13.5 min
C/O
10 min
Availability
96%
Quality FPY
98.6%
Batch / EPEI
19 / 1d
OEE
92.0%
i
FIFO
Insert a step here
+
I
34
0.71 d
Drag to reorder step 5
REGISTRY OUT
5. Cullet & Ingot S…
×1
Continuous Flow
C/T
10.1 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
14 / 1d
OEE
93.5%
i
Insert a step at the end
+
I
58
1.21 d
Finished Goods
OUT
1.40 d
VA 12.8 min
1.60 d
VA 15.8 min
2.00 d
VA 20.1 min
0.90 d
VA 13.5 min
0.71 d
VA 10.1 min
1.21 d
Total Lead Time
7.89 d
VA Time
1.2 h
PCE
1.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step