Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
EU CBAM & EUDR Deforestation Supply-Chain Gate
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
4.7 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.85 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
18.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.52%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Embedded Emission Formula QC
65 < 95/day
Limit: downtime
Embedded Emission Formula QC: capacity 65/day vs demand 95/day. Main limit: downtime. Raw C/T 5.1 min, effective C/T 6.3 min.
Quality (RTY)
89.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€107,590
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
218.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Global Tier-1 Importe…
Geolocation Polygons & …
Continuous Renewable · LT 2d
PRODUCTION CONTROL / ERP
TradeESG Cloud
High-Energy Peak Curtailment
CUSTOMER
EU Customs & Trade De…
95 files/d
Takt: 4.7 min
EDI / Certified Lots
MRP / Continuous Renewable
★ PACEMAKER
IN
Insert a step at the start
+
I
133
1.40 d
Drag to reorder step 1
INTAKE MODULE
1. Supplier Polygon…
×2
Continuous Flow
C/T
3.2 min
C/O
20 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
95 / 2d
OEE
88.2%
i
Insert a step here
+
I
152
1.60 d
Drag to reorder step 2
CLEAN REACTOR
2. Satellite Defore…
×2
Push Flow
C/T
4.0 min
C/O
30 min
Availability
91%
Quality FPY
97.4%
Batch / EPEI
95 / 2d
OEE
82.7%
i
Insert a step here
+
I
190
2.00 d
GREEN
Renewable…
Drag to reorder step 3
CORE UNIT
3. Embedded Emissio…
×2
BOTTLENECK
C/T
5.1 min
C/O
40 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
95 / 2d
OEE
73.3%
i
Insert a step here
+
I
86
0.91 d
Drag to reorder step 4
PURITY LAB
4. Missing Data Sup…
×2
FIFO Lane
C/T
3.4 min
C/O
10 min
Availability
96%
Quality FPY
98.6%
Batch / EPEI
38 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
67
0.71 d
Drag to reorder step 5
REGISTRY OUT
5. Quarterly CBAM X…
×1
Continuous Flow
C/T
2.6 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
29 / 1d
OEE
90.8%
i
Insert a step at the end
+
I
114
1.20 d
Finished Goods
OUT
1.40 d
VA 3.2 min
1.60 d
VA 4.0 min
2.00 d
VA 5.1 min
0.91 d
VA 3.4 min
0.71 d
VA 2.6 min
1.20 d
Total Lead Time
7.85 d
VA Time
18.2 min
PCE
0.52%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step