Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
High-Nickel NMC Prismatic Cell Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
23 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
92 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Jelly-Roll Wind & Can Weld
2,561 < 3,600/day
Limit: downtime
Jelly-Roll Wind & Can Weld: capacity 2,561/day vs demand 3,600/day. Main limit: downtime. Raw C/T 25 s, effective C/T 31 s.
Quality (RTY)
87.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,919,520
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2,585.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
NMC cathode-material …
NMC811, Graphite & Elec…
Daily · LT 7d
PRODUCTION CONTROL / ERP
MES
Formation Rack Batch Hold
CUSTOMER
EV Module Pack Plants
3,600 units/d
Takt: 23 s
EDI / Hourly JIT
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
5,400
1.50 d
Drag to reorder step 1
DRY ROOM
1. Twin-Shaft Slurr…
×2
Continuous Flow
C/T
17 s
C/O
55 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
3600 / 2d
OEE
86.3%
i
Insert a step here
+
I
5,040
1.40 d
Drag to reorder step 2
DRY ROOM A
2. Vacuum Calender …
×2
Push Flow
C/T
19 s
C/O
30 min
Availability
91%
Quality FPY
96.9%
Batch / EPEI
2160 / 1d
OEE
84.9%
i
Insert a step here
+
I
10,080
2.80 d
GREEN
Regenerat…
Drag to reorder step 3
FORMATION RACK
3. Jelly-Roll Wind …
×3
BOTTLENECK
C/T
25 s
C/O
20 min
Availability
84%
Quality FPY
94.5%
Batch / EPEI
4320 / 2d
OEE
78.4%
i
Insert a step here
+
I
3,600
1.00 d
Drag to reorder step 4
MODULE BAY
4. Vacuum Electroly…
×2
FIFO Lane
C/T
18 s
C/O
18 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
1080 / 1d
OEE
87.3%
i
FIFO
Insert a step here
+
I
2,520
0.70 d
Drag to reorder step 5
PACK EOL
5. ACIR OCV Grading…
×2
FIFO Lane
C/T
14 s
C/O
12 min
Availability
96%
Quality FPY
99.3%
Batch / EPEI
540 / 1d
OEE
89.7%
i
Insert a step at the end
+
I
4,320
1.20 d
Finished Goods
OUT
1.50 d
VA 17 s
1.40 d
VA 19 s
2.80 d
VA 25 s
1.00 d
VA 18 s
0.70 d
VA 14 s
1.20 d
Total Lead Time
8.60 d
VA Time
92 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step