Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Vacuum-Brazed Aluminum Battery Cold Plate
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
49 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.04%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
CAB Nitrogen Brazing Furnace
779 < 1,100/day
Limit: downtime
CAB Nitrogen Brazing Furnace: capacity 779/day vs demand 1,100/day. Main limit: downtime. Raw C/T 54 s, effective C/T 68 s.
Quality (RTY)
87.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€700,040
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
789.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Clad brazing-sheet su…
3003/4343 Clad Brazing …
Daily · LT 7d
PRODUCTION CONTROL / ERP
Automotive ERP
Formation Rack Batch Hold
CUSTOMER
BEV Battery Tier-1
1,100 parts/d
Takt: 49 s
EDI / Hourly JIT
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
1,650
1.50 d
Drag to reorder step 1
DRY ROOM
1. Serpentine Stamp…
×2
Continuous Flow
C/T
36 s
C/O
55 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
1100 / 2d
OEE
84.5%
i
Insert a step here
+
I
1,540
1.40 d
Drag to reorder step 2
DRY ROOM A
2. Flux Spray & Cor…
×2
Push Flow
C/T
42 s
C/O
30 min
Availability
91%
Quality FPY
96.9%
Batch / EPEI
660 / 1d
OEE
83.3%
i
Insert a step here
+
I
3,080
2.80 d
GREEN
Regenerat…
Drag to reorder step 3
FORMATION RACK
3. CAB Nitrogen Bra…
×3
BOTTLENECK
C/T
54 s
C/O
20 min
Availability
84%
Quality FPY
94.5%
Batch / EPEI
1320 / 2d
OEE
77.9%
i
Insert a step here
+
I
1,100
1.00 d
Drag to reorder step 4
MODULE BAY
4. Pressure Decay &…
×2
FIFO Lane
C/T
38 s
C/O
18 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
330 / 1d
OEE
85.2%
i
FIFO
Insert a step here
+
I
770
0.70 d
Drag to reorder step 5
PACK EOL
5. CNC Port Mill & …
×2
FIFO Lane
C/T
30 s
C/O
12 min
Availability
96%
Quality FPY
99.3%
Batch / EPEI
165 / 1d
OEE
86.9%
i
Insert a step at the end
+
I
1,320
1.20 d
Finished Goods
OUT
1.50 d
VA 36 s
1.40 d
VA 42 s
2.80 d
VA 54 s
1.00 d
VA 38 s
0.70 d
VA 30 s
1.20 d
Total Lead Time
8.60 d
VA Time
3.3 min
PCE
0.04%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂