Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
49 s
Lead Time (LT)
8.60 d
Value-Added
3.3 min
Efficiency (PCE)
0.04%
BottleneckCAB Nitrogen Brazing Furnace
779 < 1,100/day
Limit: downtime
Quality (RTY)
87.3%
WIP Capital
€700,040
Carbon CO₂
789.9 t CO₂e/year