Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
3kW 800V-to-12V DC-DC Step-Down Unit
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
57 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.05%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Gap-Pad & Case Torque
668 < 950/day
Limit: downtime
Gap-Pad & Case Torque: capacity 668/day vs demand 950/day. Main limit: downtime. Raw C/T 63 s, effective C/T 79 s.
Quality (RTY)
87.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,143,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
682.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Ferrite & power-chip …
Planar Chokes & Al Hous…
Daily · LT 7d
PRODUCTION CONTROL / ERP
Production ERP
Formation Rack Batch Hold
CUSTOMER
BEV Electrical Archit…
950 units/d
Takt: 57 s
EDI / Hourly JIT
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
1,425
1.50 d
Drag to reorder step 1
DRY ROOM
1. Die-Cast Heat-Si…
×2
Continuous Flow
C/T
42 s
C/O
55 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
950 / 2d
OEE
84.5%
i
Insert a step here
+
I
1,330
1.40 d
Drag to reorder step 2
DRY ROOM A
2. Power Stage SMT …
×2
Push Flow
C/T
48 s
C/O
30 min
Availability
91%
Quality FPY
96.9%
Batch / EPEI
570 / 1d
OEE
83.3%
i
Insert a step here
+
I
2,660
2.80 d
GREEN
Regenerat…
Drag to reorder step 3
FORMATION RACK
3. Gap-Pad & Case T…
×3
BOTTLENECK
C/T
63 s
C/O
20 min
Availability
84%
Quality FPY
94.5%
Batch / EPEI
1140 / 2d
OEE
77.9%
i
Insert a step here
+
I
950
1.00 d
Drag to reorder step 4
MODULE BAY
4. ESS Thermal Cycl…
×2
FIFO Lane
C/T
44 s
C/O
18 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
285 / 1d
OEE
85.2%
i
FIFO
Insert a step here
+
I
665
0.70 d
Drag to reorder step 5
PACK EOL
5. Efficiency Curve…
×2
FIFO Lane
C/T
34 s
C/O
12 min
Availability
96%
Quality FPY
99.3%
Batch / EPEI
143 / 1d
OEE
86.9%
i
Insert a step at the end
+
I
1,140
1.20 d
Finished Goods
OUT
1.50 d
VA 42 s
1.40 d
VA 48 s
2.80 d
VA 63 s
1.00 d
VA 44 s
0.70 d
VA 34 s
1.20 d
Total Lead Time
8.60 d
VA Time
3.9 min
PCE
0.05%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step