Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
43 s
Lead Time (LT)
8.60 d
Value-Added
2.9 min
Efficiency (PCE)
0.04%
BottleneckShrink Tube & Shield Braid
876 < 1,250/day
Limit: downtime
Quality (RTY)
87.3%
WIP Capital
€1,236,250
Carbon CO₂
897.6 t CO₂e/year