Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Shielded 800V Orange HV Cable Harness
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
43 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.04%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Shrink Tube & Shield Braid
876 < 1,250/day
Limit: downtime
Shrink Tube & Shield Braid: capacity 876/day vs demand 1,250/day. Main limit: downtime. Raw C/T 48 s, effective C/T 60 s.
Quality (RTY)
87.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,236,250
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
897.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Copper foil & PE supp…
95mm² Copper & HV Conne…
Daily · LT 7d
PRODUCTION CONTROL / ERP
Harness ERP
Formation Rack Batch Hold
CUSTOMER
BEV Drivetrain & Char…
1,250 units/d
Takt: 43 s
EDI / Hourly JIT
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
1,875
1.50 d
Drag to reorder step 1
DRY ROOM
1. Auto Reel Cut & …
×2
Continuous Flow
C/T
32 s
C/O
55 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
1250 / 2d
OEE
84.5%
i
Insert a step here
+
I
1,750
1.40 d
Drag to reorder step 2
DRY ROOM A
2. Ultrasonic Ring …
×2
Push Flow
C/T
37 s
C/O
30 min
Availability
91%
Quality FPY
96.9%
Batch / EPEI
750 / 1d
OEE
83.3%
i
Insert a step here
+
I
3,500
2.80 d
GREEN
Regenerat…
Drag to reorder step 3
FORMATION RACK
3. Shrink Tube & Sh…
×3
BOTTLENECK
C/T
48 s
C/O
20 min
Availability
84%
Quality FPY
94.5%
Batch / EPEI
1500 / 2d
OEE
77.9%
i
Insert a step here
+
I
1,250
1.00 d
Drag to reorder step 4
MODULE BAY
4. HV Plug Click & …
×2
FIFO Lane
C/T
34 s
C/O
18 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
375 / 1d
OEE
85.2%
i
FIFO
Insert a step here
+
I
875
0.70 d
Drag to reorder step 5
PACK EOL
5. 3kV Hipot & Pin …
×2
FIFO Lane
C/T
26 s
C/O
12 min
Availability
96%
Quality FPY
99.3%
Batch / EPEI
188 / 1d
OEE
86.9%
i
Insert a step at the end
+
I
1,500
1.20 d
Finished Goods
OUT
1.50 d
VA 32 s
1.40 d
VA 37 s
2.80 d
VA 48 s
1.00 d
VA 34 s
0.70 d
VA 26 s
1.20 d
Total Lead Time
8.60 d
VA Time
2.9 min
PCE
0.04%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step