Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
3.8 min
Lead Time (LT)
8.62 d
Value-Added
15.3 min
Efficiency (PCE)
0.20%
BottleneckSide Rail Structural Glue
170 < 240/day
Limit: downtime
Quality (RTY)
87.3%
WIP Capital
€4,334,400
Carbon CO₂
172.3 t CO₂e/year