Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
87 s
Lead Time (LT)
8.61 d
Value-Added
5.9 min
Efficiency (PCE)
0.08%
BottleneckCold-Plate Thermal Interface
438 < 620/day
Limit: downtime
Quality (RTY)
87.3%
WIP Capital
€1,519,620
Carbon CO₂
445.2 t CO₂e/year