Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Solid-State Oxide Electrolyte Pilot Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.62 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
10.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.26%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Isostatic Warm Press Stack
125 < 180/day
Limit: downtime
Isostatic Warm Press Stack: capacity 125/day vs demand 180/day. Main limit: downtime. Raw C/T 2.8 min, effective C/T 3.5 min.
Quality (RTY)
87.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€325,080
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
129.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Ceramic powder suppli…
LLZO Ceramic Separator …
Daily · LT 7d
PRODUCTION CONTROL / ERP
MES
Formation Rack Batch Hold
CUSTOMER
OEM EV R&D & Pilot Fl…
180 units/d
Takt: 2.5 min
EDI / Hourly JIT
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
270
1.50 d
Drag to reorder step 1
DRY ROOM
1. Oxide Tape Cast …
×2
Continuous Flow
C/T
111 s
C/O
55 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
180 / 2d
OEE
79.0%
i
Insert a step here
+
I
252
1.40 d
Drag to reorder step 2
DRY ROOM A
2. Lithium Foil Cal…
×2
Push Flow
C/T
2.1 min
C/O
30 min
Availability
91%
Quality FPY
96.9%
Batch / EPEI
108 / 1d
OEE
78.4%
i
Insert a step here
+
I
504
2.80 d
GREEN
Regenerat…
Drag to reorder step 3
FORMATION RACK
3. Isostatic Warm P…
×3
BOTTLENECK
C/T
2.8 min
C/O
20 min
Availability
84%
Quality FPY
94.5%
Batch / EPEI
216 / 2d
OEE
76.4%
i
Insert a step here
+
I
180
1.00 d
Drag to reorder step 4
MODULE BAY
4. Laser Weld Pouch…
×2
FIFO Lane
C/T
117 s
C/O
18 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
54 / 1d
OEE
79.1%
i
FIFO
Insert a step here
+
I
126
0.70 d
Drag to reorder step 5
PACK EOL
5. EIS Impedance Sp…
×2
FIFO Lane
C/T
90 s
C/O
12 min
Availability
96%
Quality FPY
99.3%
Batch / EPEI
27 / 1d
OEE
78.4%
i
Insert a step at the end
+
I
216
1.20 d
Finished Goods
OUT
1.50 d
VA 111 s
1.40 d
VA 2.1 min
2.80 d
VA 2.8 min
1.00 d
VA 117 s
0.70 d
VA 90 s
1.20 d
Total Lead Time
8.62 d
VA Time
10.2 min
PCE
0.26%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step