Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Standardized Battery-Swap Pack Station
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.6 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.63 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
22.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.29%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Laser Module Weld & Frame
113 < 160/day
Limit: downtime
Laser Module Weld & Frame: capacity 113/day vs demand 160/day. Main limit: downtime. Raw C/T 6.2 min, effective C/T 7.8 min.
Quality (RTY)
87.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€4,678,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
114.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Battery Tier-1 suppli…
LFP Modules & Quick-Cou…
Daily · LT 7d
PRODUCTION CONTROL / ERP
Cloud MES
Formation Rack Batch Hold
CUSTOMER
Swap Station Network
160 packs/d
Takt: 5.6 min
EDI / Hourly JIT
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
240
1.50 d
Drag to reorder step 1
DRY ROOM
1. Quick-Lock Coupl…
×2
Continuous Flow
C/T
4.2 min
C/O
55 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
160 / 2d
OEE
84.5%
i
Insert a step here
+
I
224
1.40 d
Drag to reorder step 2
DRY ROOM A
2. Drip-Free Fluid …
×2
Push Flow
C/T
4.8 min
C/O
30 min
Availability
91%
Quality FPY
96.9%
Batch / EPEI
96 / 1d
OEE
83.3%
i
Insert a step here
+
I
448
2.80 d
GREEN
Regenerat…
Drag to reorder step 3
FORMATION RACK
3. Laser Module Wel…
×3
BOTTLENECK
C/T
6.2 min
C/O
20 min
Availability
84%
Quality FPY
94.5%
Batch / EPEI
192 / 2d
OEE
77.9%
i
Insert a step here
+
I
160
1.00 d
Drag to reorder step 4
MODULE BAY
4. Automated Swap R…
×2
FIFO Lane
C/T
4.4 min
C/O
18 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
48 / 1d
OEE
85.2%
i
FIFO
Insert a step here
+
I
112
0.70 d
Drag to reorder step 5
PACK EOL
5. 50-Cycle Quick-S…
×2
FIFO Lane
C/T
3.4 min
C/O
12 min
Availability
96%
Quality FPY
99.3%
Batch / EPEI
24 / 1d
OEE
86.9%
i
Insert a step at the end
+
I
192
1.20 d
Finished Goods
OUT
1.50 d
VA 4.2 min
1.40 d
VA 4.8 min
2.80 d
VA 6.2 min
1.00 d
VA 4.4 min
0.70 d
VA 3.4 min
1.20 d
Total Lead Time
8.63 d
VA Time
22.9 min
PCE
0.29%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step