Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Dealership Point-of-Sale Auto Finance Approval
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.61 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
13.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.17%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Manual Fraud Flag Referral
158 < 240/day
Limit: downtime
Manual Fraud Flag Referral: capacity 158/day vs demand 240/day. Main limit: downtime. Raw C/T 4.0 min, effective C/T 5.3 min.
Quality (RTY)
66.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€86,688
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
26.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Credit Bureau Instant
Driver ID & Dealer Invo…
Continuous API · LT 2d
PRODUCTION CONTROL / ERP
Auto Finance Engine
FIFO Queue with Manual Return Loops
CUSTOMER
Auto Dealership F&I D…
240 files/d
Takt: 3.8 min
EDI / Daily SEPA/SWIFT
MRP / Continuous API
★ PACEMAKER
IN
Insert a step at the start
+
I
432
1.80 d
Drag to reorder step 1
FRONT OFFICE
1. Dealer App ID OC…
×3
Push Flow
C/T
2.4 min
C/O
5 min
Availability
96%
Quality FPY
86.0%
Batch / EPEI
60 / 1d
OEE
80.7%
i
Insert a step here
+
I
384
1.60 d
Drag to reorder step 2
COMPLIANCE
2. Instant Bureau A…
×2
Push Flow
C/T
2.9 min
C/O
8 min
Availability
94%
Quality FPY
91.5%
Batch / EPEI
60 / 1d
OEE
83.0%
i
Insert a step here
+
I
768
3.20 d
QUALITY
Straight-…
Drag to reorder step 3
RISK DESK
3. Manual Fraud Fla…
×4
BOTTLENECK
C/T
4.0 min
C/O
12 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
48 / 1d
OEE
70.6%
i
Insert a step here
+
I
240
1.00 d
Drag to reorder step 4
LEGAL OPS
4. E-Sign Consumer …
×2
FIFO Lane
C/T
2.3 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
24 / 1d
OEE
88.4%
i
FIFO
Insert a step here
+
I
120
0.50 d
Drag to reorder step 5
TREASURY
5. Same-Hour Dealer…
×1
Continuous Flow
C/T
95 s
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
24 / 1d
OEE
96.2%
i
Insert a step at the end
+
I
120
0.50 d
Finished Goods
OUT
1.80 d
VA 2.4 min
1.60 d
VA 2.9 min
3.20 d
VA 4.0 min
1.00 d
VA 2.3 min
0.50 d
VA 95 s
0.50 d
Total Lead Time
8.61 d
VA Time
13.3 min
PCE
0.17%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step