Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Mid-Market Commercial Property & Liability Quote
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
6.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.26 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
25.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.68%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Senior Underwriter Price Blend
42 < 65/day
Limit: downtime
Senior Underwriter Price Blend: capacity 42/day vs demand 65/day. Main limit: downtime. Raw C/T 7.5 min, effective C/T 9.8 min.
Quality (RTY)
70.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€77,285
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Broker Submissions & …
SOV Asset Lists & Loss …
Daily Adjusters · LT 3d
PRODUCTION CONTROL / ERP
Policy Admin System
Manual Triage & Pool Escalation
CUSTOMER
Commercial Insurance …
65 files/d
Takt: 6.9 min
EDI / Daily Payout
MRP / Daily Adjusters
★ PACEMAKER
IN
Insert a step at the start
+
I
91
1.40 d
Drag to reorder step 1
CONTACT CENTER
1. Broker Email PDF…
×4
Push Flow
C/T
4.7 min
C/O
3 min
Availability
97%
Quality FPY
88.0%
Batch / EPEI
13 / 1d
OEE
82.5%
i
Insert a step here
+
I
117
1.80 d
Drag to reorder step 2
BACK OFFICE
2. Catastrophe GIS …
×3
Push Flow
C/T
5.4 min
C/O
5 min
Availability
94%
Quality FPY
93.5%
Batch / EPEI
16 / 1d
OEE
83.9%
i
Insert a step here
+
I
221
3.40 d
AUTOMATION
Fast-Trac…
Drag to reorder step 3
TECHNICAL CLAIMS
3. Senior Underwrit…
×5
BOTTLENECK
C/T
7.5 min
C/O
10 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
16 / 2d
OEE
69.6%
i
Insert a step here
+
I
52
0.80 d
Drag to reorder step 4
CLAIMS LEAD
4. Quote Letter Iss…
×2
FIFO Lane
C/T
4.7 min
C/O
4 min
Availability
96%
Quality FPY
97.4%
Batch / EPEI
7 / 1d
OEE
85.8%
i
FIFO
Insert a step here
+
I
26
0.40 d
Drag to reorder step 5
FINANCE OPS
5. Policy Bind & Ce…
×1
Continuous Flow
C/T
3.1 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
7 / 1d
OEE
94.1%
i
Insert a step at the end
+
I
26
0.40 d
Finished Goods
OUT
1.40 d
VA 4.7 min
1.80 d
VA 5.4 min
3.40 d
VA 7.5 min
0.80 d
VA 4.7 min
0.40 d
VA 3.1 min
0.40 d
Total Lead Time
8.26 d
VA Time
25.4 min
PCE
0.68%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step