Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Supply-Chain Early-Payment Dynamic Discounting
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.72 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
10.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.30%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Vendor Early-Accept Confirm
104 < 160/day
Limit: downtime
Vendor Early-Accept Confirm: capacity 104/day vs demand 160/day. Main limit: downtime. Raw C/T 3.0 min, effective C/T 3.9 min.
Quality (RTY)
72.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€19,712
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Approved AP Invoices
Vendor Early-Pay Offers
Daily POD Sync · LT 1d
PRODUCTION CONTROL / ERP
Supply Chain Finance Platform
Exception Rework Loops
CUSTOMER
Corporate Treasury Yi…
160 invoices/d
Takt: 2.8 min
EDI / Daily Cash Run
MRP / Daily POD Sync
★ PACEMAKER
IN
Insert a step at the start
+
I
224
1.40 d
Drag to reorder step 1
INTAKE DESK
1. Approved AP Batc…
×3
Push Flow
C/T
111 s
C/O
2 min
Availability
96%
Quality FPY
89.5%
Batch / EPEI
40 / 1d
OEE
84.4%
i
Insert a step here
+
I
240
1.50 d
Drag to reorder step 2
BILLING/AP
2. APR Yield Bid Op…
×2
Push Flow
C/T
2.2 min
C/O
2 min
Availability
95%
Quality FPY
93.8%
Batch / EPEI
40 / 1d
OEE
87.5%
i
Insert a step here
+
I
464
2.90 d
QUALITY
Source CR…
Drag to reorder step 3
DISPUTES DESK
3. Vendor Early-Acc…
×4
BOTTLENECK
C/T
3.0 min
C/O
8 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
32 / 1d
OEE
69.7%
i
Insert a step here
+
I
144
0.90 d
Drag to reorder step 4
CONTROLLERS
4. Treasury Cash Al…
×2
FIFO Lane
C/T
108 s
C/O
3 min
Availability
97%
Quality FPY
98.4%
Batch / EPEI
32 / 1d
OEE
92.3%
i
FIFO
Insert a step here
+
I
80
0.50 d
Drag to reorder step 5
TREASURY
5. Immediate Early-…
×1
Continuous Flow
C/T
84 s
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
24 / 1d
OEE
95.2%
i
Insert a step at the end
+
I
80
0.50 d
Finished Goods
OUT
1.40 d
VA 111 s
1.50 d
VA 2.2 min
2.90 d
VA 3.0 min
0.90 d
VA 108 s
0.50 d
VA 84 s
0.50 d
Total Lead Time
7.72 d
VA Time
10.3 min
PCE
0.30%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step