Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Litigation Hold & Legal eDiscovery Review Desk
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
28.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.48 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.68%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
TAR Predictive Privilege Review
10 < 16/day
Limit: changeovers
TAR Predictive Privilege Review: capacity 10/day vs demand 16/day. Main limit: changeovers. Raw C/T 30.4 min, effective C/T 40.2 min.
Quality (RTY)
74.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€217,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
0.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Collaboration Suite /…
Custodian ESI Mailboxes
Continuous External · LT 2d
PRODUCTION CONTROL / ERP
eDiscovery Platform
Email Redline Ping-Pong
CUSTOMER
Outside Trial Counsel
16 cases/d
Takt: 28.1 min
EDI / E-Sign Complete
MRP / Continuous External
★ PACEMAKER
IN
Insert a step at the start
+
I
22
1.38 d
Drag to reorder step 1
LEGAL INTAKE
1. Legal Hold Custo…
×2
FIFO Lane
C/T
17.4 min
C/O
5 min
Availability
97%
Quality FPY
91.5%
Batch / EPEI
4 / 1d
OEE
84.8%
i
FIFO
Insert a step here
+
I
29
1.81 d
Drag to reorder step 2
PRIVACY/TAX
2. Forensic PST Col…
×2
Push Flow
C/T
22.5 min
C/O
8 min
Availability
93%
Quality FPY
94.0%
Batch / EPEI
4 / 1d
OEE
81.2%
i
Insert a step here
+
I
56
3.50 d
FLOW
Pre-Appro…
Drag to reorder step 3
COUNSEL DESK
3. TAR Predictive P…
×3
BOTTLENECK
C/T
30.4 min
C/O
12 min
Availability
85%
Quality FPY
89.0%
Batch / EPEI
3 / 1d
OEE
64.9%
i
Insert a step here
+
I
14
0.88 d
Drag to reorder step 4
GC / CFO
4. Privilege Log QC…
×1
FIFO Lane
C/T
19.1 min
C/O
4 min
Availability
96%
Quality FPY
97.8%
Batch / EPEI
2 / 1d
OEE
87.2%
i
FIFO
Insert a step here
+
I
6
0.38 d
Drag to reorder step 5
CLM REPOSITORY
5. Opposing Counsel…
×1
Continuous Flow
C/T
12.7 min
C/O
2 min
Availability
99%
Quality FPY
99.5%
Batch / EPEI
2 / 1d
OEE
95.0%
i
Insert a step at the end
+
I
5
0.31 d
Finished Goods
OUT
1.38 d
VA 17.4 min
1.81 d
VA 22.5 min
3.50 d
VA 30.4 min
0.88 d
VA 19.1 min
0.38 d
VA 12.7 min
0.31 d
Total Lead Time
8.48 d
VA Time
1.7 h
PCE
2.68%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step